A work update from Joel:
1) Wash, sanitize and scrap exterior (2,400 sq. ft.)
2)
Seal with Berger “Grip and Seal” primer 2 coats
3)
Paint 2 coats Berger “Weather Proof” (4,800 sq. ft. in total)
4)
Repair bottom of doors and railings
5)
Form and pour concrete pier in lower storage area
6)
Install hand railing to basement
7)
Flashing on Roof
-Remove
existing asphalt flashing and clean
-Measure
and order 235 lineal feet of capping and flashing
-
Install capping on parapet ends of building
-
Install and caulk all flashing along walls
8)
Paint entrance to sanctuary
9)
Paint main sanctuary (1,600 sq. ft.)
10)
Remove and paint sign for church
-Install
directly to concrete
11)
Repair and replace glass windows