A Work summary from Joel:
1) Siding on youth hall
-Remove
all siding on church side of building
-Repair
framing and re-install windows
-Install
500 lineal feet of 1 x 8 purple heart siding
-Install
new sills and trim on windows, doors and corners
-Prime
and paint exterior of building (840 sq. ft. in total)
-Paint
interior of building (320 sq. ft.)
-Remove
rotten existing window awnings on neighbours` side
-Remove
and replace rotten and poor siding and trim
-Paint
exterior with 2 coats of oil (560 sq. ft.)
2)
Repair and replace door awning
3)
Purchase and install new security mesh for windows
4)
Repair trim on front of youth hall, seal and paint
5)
Repair 3 doors on youth hall and paint
-Install
new door threshold on office
6)
Replace 5 wooden doors in daycare
-Purchase
and install solid pine – six panel doors
-Purchase
and install new door hardware
-Prime
and paint 8 doors
7)
Screen doors
-Remove
screens and repair 4 wood doors
-Purchase
and install new screen and metal grilles
-Make
and install new wood trim and stops
-Prime
and paint
-Install
new hardware
8)
Playground equipment
-Remove
rotten or damaged wood
-Install
new floor in climbing tower
-Install
roof on play building
-Install
new ramp to slide
-Install
new teeter-totter
-Install
new swings and infant swing seat
-Paint
with red, yellow, and green (approx. 600 sq. ft.)
9)
Sign Letters
-Grind
off layers of paint and old fasteners
-Paint
with red oil `THE SALVATION ARMY`
-Install
on front wall of church
-Install
new light fixture on front
10)
Sand and repair Mahogany exterior doors on church
-Coat
with 2 coats of clear wood varnish
11)
Sand, scrape, prime and paint wood entrance to corps
12)
Exterior of sanctuary
-Power
wash and sanitize exterior
-Scrape
loose paint
-Prime
bare masonry with grip and seal
-Paint
exterior or building (1,600 sq. ft.)
-Paint
splash border on church, youth hall, and in courtyard (280 ft.)
-Paint
facia boards and trim
13)
Paint metal gate
14)
Repair children`s benches
15)
Install wood display boards in daycare
16)
Repair metal gate on parking area
17)
Repair toilets and plumbing
-Attempted
repair to roof top water heater
18)
Make and install 48 lineal feet of heavy shelving in storage
-Do
clean-up and sorting on shelving and Sunday school room
19)
Replace 6 panes of glass
-Install
new window putty on 40 panes and paint window frames
20)
Make operational metal security door on daycare – safety exit