Project #3 - Josie Hill Corps

  

  

A work update from Joel:

                1) Wash, sanitize and scrap exterior (2,400 sq. ft.)                                                                 

                2) Seal with Berger “Grip and Seal” primer 2 coats                                                                                 

                3) Paint 2 coats Berger “Weather Proof” (4,800 sq. ft. in total)                                                 

                4) Repair bottom of doors and railings 

                5) Form and pour concrete pier in lower storage area 

                6) Install hand railing to basement 

                7) Flashing on Roof
                                -Remove existing asphalt flashing and clean
                                -Measure and order 235 lineal feet of capping and flashing
                                - Install capping on parapet ends of building
                                - Install and caulk all flashing along walls 

                8) Paint entrance to sanctuary 

                9) Paint main sanctuary (1,600 sq. ft.) 

                10) Remove and paint sign for church
                                -Install directly to concrete 

                11) Repair and replace glass windows
 
                12) Minor repairs to plumbing

Saturday, February 1, 2014

Project #2 - Central Corps Officers Quarters

Plan: To replace roof (due to leaks) and repair backyard privacy fence. A summary of the work completed sent by Joel:

                1) Remove and replace rotten 1 x 6 v-joint soffit                                                                  

                2) Remove and replace rotten ridge beam                                                                      

                3) Install 2 x 3 purlins on roof
                                -Cut off shingles and wood overhang on gable ends
                                -Install 1,120 lineal feet of 2 x 3 P.T. purlins, screwed down
                                -Install 2 x 6 P.T. band around bottom of roof 

                4) Install metal roofing
                                -Install 1,200 sq. ft. of coloured industrial 6 metal roofing
                                -Install foam bat strips at eave and ridge
                                -Install coloured metal ridge cap and gable caps 

                5) Repair privacy fence
                                -Remove existing rotten and broken framing
                                -Rebuild frame and install privacy panels
                                -Build and install gate to privacy area 

                6) Repair 1 ceiling fan                                                                                    

                7) Install 45 sq. ft. of vinyl tile to do quick repair of kitchen floor 

                8) Paint soffits and facia of building (340 sq. ft.)


    
 

PS - Thanks to Paul Robertson for these photos (I did not actually work at this site).

Thursday, January 30, 2014

project #1 is complete! Long bay retired officers residence is done. A complete repaint of the outside and inside one of the vacated apartments. A toilet and a number of door knobs and locks were replaced as well as lots of scrubbing, landscaping, light replacement and fence repairs were completed. The majors next door were so thankful and happy with the new greenish colour... not exactly our first choice but in the warm climate it does seem appropriate. Now onto our next project... Josey Hill Corps.

Before:

  

After:
   


A summary of all the projects undertaken sent by Joel:

                1) Soffit and facia
                                -Scrape loose paint
                                -Power wash to clean
                                -Sand wood
                                -Prime bare wood
                                -Paint soffit and facia (1,000 sq. ft.) 

                2) Exterior walls
                                -Power wash areas of dirt and mold
                                -Sterilize surfaces where mold present
                                -Wash all walls
                                -Paint exterior surfaces (2,000 sq. ft.) 

                3) Exterior wood fence
                                -Remove rotten boards
                                -Install new boards and cap pieces
                                -Install diagonal wall braces
                                -Repair gates and replace hinges
                                -Power wash and scrape all surfaces
                                -Prime bare wood
                                -Paint all surfaces with oil paint (975 sq. ft.) 

                4) Wooden louvers
                                -Remove all wooden louvers
                                -Install 184 new vinyl louvers
                                -Repair hardware to allow operation
                                -Clean and re-install screens 

                5) Paint interior of apartment `B`
                                -Clean apartment and pack up contents
                                -Paint trim and doors (5 doors, casing, and baseboard)
                                -Paint interior walls (1,750 sq. ft.) 

                6) Repair backsplash in kitchen 

                7) Install new door hardware 

                8) Install new toilet 

                9) Replace and repair electrical 

                10) Clean courtyard
                                -Sweep entire courtyard
                                -Remove weeds and brush
                                -Re-work garden areas
                                -Power wash perimeter fence 

                11) Apartment A
                                -Install new door hardware
                                -Repair exterior path light
                                -Repair toilet
                                -Build new chicken coop (complete with 4 chicks)

Tuesday, January 28, 2014

Barbados Mission - 2014 - update #1 - in photos....

A few brief photos of our first project - the Longbay Retired Officers Residence.














Saturday, October 19, 2013

Barbados Projects - Work Planned

A brief summary of the projects we hope to be able address with this years mission trip:

Josey Hill Corps

  •         Major issue is water penetration through paint into cement walls.
  •         Plan to scrape, treat, and paint outside walls.
  •         Some roofing repairs required (flashing work)
   

Retired Officers Residence

  •         Landscaping (weed pulling)
  •         Fence repairs – boards falling off, and needs painting
  •         Louvered Windows – some need replacing
  •         Painting – soffits and facia boards (also needs scraping), outside walls
-         
 

Central Corps Quarters

  •         Roof – replace asphalt shingles and ridge beam
  •         Privacy Fence – needs repair
  •         Replace 2 Ceiling fans
  •         Floor tiles – repair or replace (if time permits)


Wellington Youth Hall

  •         Siding – wood damage – needs replacing
  •         Painting – repaired beams
  •         Window frames – significant wood rot – needs repair and painting
     


     

Wednesday, October 16, 2013

2014 Mission to Barbados - Planning Meeting

To anyone interested in finding out more and (hopefully) participating in this years mission trip to restore properties for the Salvation Ary in Barbados, we will be having our information meeting this weekend!  Details are as follows:

Meeting Location: The Salvation Army, North York Temple, 25 Centre Ave, North York
                               (East off Yonge St, South of Steeles Ave)
Time:                     2:00 - 5:00 approx.

Hope to see you there!

(If this is the only invite you've received, please email me at laurie_mcarthur@hotmail.com so that I can email you an application form in advance of the meeting!)





 

Wednesday, January 30, 2013

Jamaica Mission 2013 - Hanbury Home for Children

Wow... time flies and due to a little too much travelling myself,  the blog has not been updated with much information on this years trip.. so ... here is a quick overview so far... more updates to come over the next two weeks!

Where are we?

Mandeville Jamaica - a 2.5 hour drive from Kingston.

Travel went really well this year. Other than having to pay for all of our extra baggage (gone are concessions from the airlines despite the purpose of our trip), customs went very smoothly and the drive was completed in daylight hours, on decent roads.

Who are we?

This year we have a diverse group of 34 ages 16-76.

What are we doing?

The goal this year is to replace the roof on the babyland building of the Hanbury Children's Home. There are 14 children residing in this building so replacing the roof, while we are also painting and repairing carpentry and plumbing needs while the children are still living in the building is a challenge to all!

For more pictures of our activities and progress, follow this link  https://www.facebook.com/media/set/?set=a.10151431791921085.540580.525681084&type=1